One of the best ways to increase property values in a homeowner’s association is to maintain association property and facilities in good condition. The Board has been working hard on taking care of our property. You’ve likely seen reference to the reserve study in the past years and the update that was undertaken in 2017. There is a separate section in this mailing that updates our status. I hope you take the time to read it.
The most apparent maintenance work accomplished in 2017 was the re-construction and paving of North Paseo Otono, the northern end of North Via Sempreverde, E Strada de Acero and the north pool parking area. Along with that the balance of our roads were sealed as we try to extend their useful life. You may have also noticed that several curb sections were replaced at the time of paving. These were primarily areas at corners where they are frequently driven over.
At the pools, the locks were changed so that it is now possible to exit the pool areas without a key. At the same time, grillwork sections were welded in place so that access to the pool cannot be gained by simply reaching around the door to use the new exit latches.
Another major project was the re-surfacing of the north tennis court. Thanks to Lee Radziemski for managing that work!
Other significant items included replacing sidewalk sections that were judged to be tripping hazards, and the iron railings/fences at the south pool were repainted. A damaged concrete catch basin on the north end of Velazquez was also repaired.
As we exit the year, arrangements have been made to re-strap some of the chaise lounges and chairs at the south pool. This will extend their useful life and allow us to postpone their eventual replacement.
The SMVE board has been working actively to have more owner participation in the management of our HOA. To that end, Rick Levy has volunteered to assist with maintenance. His assistance will be especially valuable in the summers when I’m not in Tucson. Thanks Rick! Thanks also to Rick van Hesselt who watches over our lighting systems.
As we move into 2018, we are working on plans for the road sections that are next in line for replacement. We are also considering painting the iron work at the north pool. As usual, please let me know if you see items that need attention. It’s good to have lots of eyes.