✉ by Mike Jump, Chair, Maintenance Committee
Phone: Cell:

This is to report some of the work that the Maintenance Committee has been doing so far this year. It has been a relatively quiet summer from a maintenance perspective and most of the work has been located around the two pool areas.

The “Pebble Tec” that was added to the South Pool came out well and has a ten year warrantee. The North Pool “Pebble Tec” has been in place for four years and seems to be holding up well. In addition, we have replaced the two bridges that are on the path to the South Pool Tennis Court. The original bridges were made of timbers that had become very soft and mushy. The new bridges are made with cement and look better and should last a long time.

We will be repairing the shower surround at the North Pool in the next couple of weeks (late October or early November). We are adding structural support, a shelf, and two hooks for towels. We will also be repairing the Pool Deck at both Pools before the end of the year. The North Pool will be done first and the pool will have to be closed for two or three days during early November. The South Pool will be done in December.

We have started reviewing our sidewalks throughout the area. Because of the heat this summer, some of the sidewalks have buckled and may cause a tripping hazard. If the sidewalk is in a common area, it is the responsibility of the HOA to fix but, if it is front of a home, it is the responsibility of the homeowner.

The South Pool will be closing again this year from December 1 through March 1, 2016. This will leave the larger North Pool open for our homeowners and their guests.